agyasmithmartersax agyasmithmartersax
  • 01-05-2017
  • Mathematics
contestada

An average of 2,000 charts need to be coded each month. if it takes an average of 15 minutes to code each chart— how many charts does the average coder code per 8-hour day?

Respuesta :

Bea1111 Bea1111
  • 01-05-2017
Put 8 hours into minutes which is 60•8= 480.
Then divide 480 by 15 to find how many charts are coded in 8 hours by a coder.
480/15= 32.

So the average worker codes 32 charts per 8-hour work day.
Answer Link

Otras preguntas

What is the GCF of 16m and 20mn?
how can you remember how to use cosinem sine, and tangent?
Jamal is opposed to drinking​ alcohol, but he has been offered a lucrative marketing job with a brewery. He is tempted to take the job but feels hypocritical. J
Which evidence is most detrimental to the james-lange theory?
The approximate​ Z-score that corresponds to a right tail area of 0.42 is what?
Kali is researching the evolution of the American fashion industry. She has found an online article that may be a helpful source. In performing her secondary ev
In the passage which characteristics of Macbeth has the greatest effect on the development of the scene?
Chris's uncle has a model car. The model is 6 inches long and 3 inches wide. The actual car is 75 inches long. What is the cars actual width, if we assume the m
The U.S. Department of Education has a data retrieval tool that provides general information about a college's graduation rates, default rates, and average borr
When voters cast votes who are they actually voting for in the presidential election?