hopsonjackie5492 hopsonjackie5492
  • 03-11-2021
  • Business
contestada

when preparing a flexible budget, variable costs are expressed as a constant amount _____, and fixed costs are expressed as a constant amount _____.

Respuesta :

kyliealexisortiz kyliealexisortiz
  • 10-11-2021

Answer: per unit; in total

Explanation:

Answer Link

Otras preguntas

I am a number between 50 and 60. one of my factors is 28. what number am I?
How would you sum up the dangers of using U.S forces to attack ISIS? What are the dangers of not doing that?
Which events in 1917 helped the United States decide to enter World War I?
The sum of 3 consecutive integers is 261. What is the middle number?
What Helps protect internal organs that are connected with the outside of the body by secreting a sticky fluid that traps microbes.
Which factor is responsible for the red color of Mars? sulphur dioxide methane iron oxide nitrogen
What is the answer to 532.4 × 100
Energy is carried to earth in
One benefit of going to work instead of college after graduation is
One major difference between plant and animal cells is that plant cells are the only ones with ?