What are the risks involved in choosing to build within one kilometer of a site such as Teotihuacan?

Respuesta :

zarampa
zarampa zarampa
  • 04-10-2021

Answer:

Explanation:

The risk is the cancellation of construction due to the high possibility of an anthropological find.

Another risk is the protests of people who feel offended by an alleged invasion of an ancestral territory.

Answer Link

Otras preguntas

A side of the triangle below has been extended to form an exterior angle of 154º. Find the value of x.
14. Name the 3 primary causes for the expected mass migration due to Climate Change
priceless in which one can be a citizen​
Complete the table so there is a proportional relationship between cups of blue paint and cups of red paint.
Thrift institutions include Select one: a. insurance companies. b. brokerage firms c. mutual savings banks. d. commercial banks.
Why were the US and the USSR allies during WWII
A garden has width of [tex]\sqrt13[/tex] and length 7[tex]\sqrt13[/tex] . What is the perimeter of the garden in simplest radical form? a. 14[tex]\sqrt13[/tex]
8) Solve the system of equations by substitution y = x + 2 3x + y = 10
Riddles:High if sitting, low if standing?Clue: Pet​
2 + 2 + 4 + 8 + 9 take away 8​