A work system has five stations that have process times of 5, 9, 4, 9, and 8. What is the bottleneck time

Respuesta :

andromache andromache
  • 04-06-2021

Answer:

9

Explanation:

Given that

There is five stations who have the process time of 5,9,4,9 and 8

We need to find out the bottleneck time

so, as we know that the bottleneck is the duration of the activity who have longer time

So as per the given situation the 9 has the longest duration activity time

So, the same is to be considered

Answer Link

Otras preguntas

Use the diagram above to determine which group of side lengths would form a right triangle. 20, 21, 29 12, 35
what is 7/9 as a decimal terminating or repeating decimal
rename the number 25,600 = hundreds
Which number line shows 1/3 and it's opposite
a gardener has 27 pansies and 36 daisies he plants an equal number of each type of flower in each row what is the greatest possible number of pansies and daisie
solve this proportion: 1/c+5=2/3
Evaluate 14.3 + 8.2 x 30
Please solve number 27.) -5(3-q) +4 =5q-11
Paloma can run the 100 meter dash in sixteen And one fith .savan best time is 19.8 seconds .how much castre is Paloma than savannah
factor completely if the polynomial is not factorable write prime also state the methods used to factor the polynomial. 1. x^2-12x+36 2. r^3-81r 3. 35x^3y