jebrinlayan9000 jebrinlayan9000
  • 02-05-2021
  • Mathematics
contestada

Mr. Kumar is getting his house renovated. 1/5 th of the work has been completed in 2 months. How much time will it take for the entire work to be completed?

Respuesta :

liam2747
liam2747 liam2747
  • 02-05-2021

Answer:

10 months

Step-by-step explanation:

If it takes 2 months to do 1/5th, it will take 4 months to do 2/5, 6 months to do 3/5, 8 months to do 4/5, and 10 months to do 5/5 or in other words the whole thing.

Answer Link

Otras preguntas

What is the factored form of y = x2 − 4x + 3?
Which term refers to a tactic used by union workers to demand better working conditions? A. blackball B. lockout C. riot D. strike
What should i study in college to become a homicide detective. I don't think this question is actually under any of the listed subjects.
What twentieth-century progressive reform did the Great Awakening foreshadow and how?
What was the Renaissance? A. the eighteenth-century era of renewed interest in classical Greece and Rome B. the rebirth of classical learning in the Middle East
What is the factored form of y = x2 − 4x + 3?
Which of the following was made possible by the Fourteenth Amendment? State governments were able to pay back money owed after the war. State governments had th
In which way was the distinction "serf" different from that of "slave"?
Why did the fact that the Arabian Peninsula is a desert help to spread the values of Islam? Select one: a. In the heat of the desert people clung to faith. b. P
Q)How is a conductor different from an insulator. A)A Conductor contains free electrons. B)A conductor contains free protons. C)A conductor contains an equal nu