katriceervin12p8wls8 katriceervin12p8wls8
  • 02-05-2020
  • Mathematics
contestada

If it takes 12 weeks for the factory to be at full capacity, how many weeks would it take for the factory to be at half capacity?

Respuesta :

jam2282
jam2282 jam2282
  • 02-05-2020

Answer:

it takes 6 weeks fir the factory to be at half capacity

Step-by-step explanation:

half of 12 is 6

Answer Link
jojiwalt
jojiwalt jojiwalt
  • 02-05-2020

It would take 6 weeks to be at half capacity

Answer Link

Otras preguntas

What is the change in number of individuals in a population over time? A. population decrease B. population stability C. population growth D. population resista
Horace read 160 pages in 4 hours. How many pages can he read in 6 hours??
The Radius of a sphere is 5 feet. find the area of the great circle of this sphere
what is the cause and effect for the french citizens armies win their revolution for liberty and equality
What is the lateral area of the rectangular prism with a base length of 17 m, a base width of 7 m, and a height of 5 m?
what time is 9 hours and 30 minutes before. 4:25
Al washed a car in 6 minutes. Fred washes the same car in 8 min. How long dies it take Al and Fred to wash the car together?
Horace read 160 pages in 4 hours. How many pages can he read in 6 hours??
Find an equivalent ratio for 22/55 and then write the proportion
other name for blood