​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

A farmer hauled in 120 bales of hay. Each of his cows ate 1 1/4 bales. How many cows the farmer feed?
If Walt can paint 25 feet of fence in an hour, and Joe can paint 35 feet in an hour, how many minutes will it take them to paint a 150-foot fence, if they work
Does every point lie in a quadrant?
Alicia estimates that the surface area of a rectangular prism with a length of 11 meters,a width of 5.6 meters,and a height of 7.2 meters is about 334 cubic met
Which of the following organisms can perform alcoholic fermentation? (1) yeast, (2) humans, (3) bacteria. a. 1 and 2 b. 1 and 3 c. 1 only d. 1, 2, and 3
The length of a diagonal of a cube with edge length 25cm
After what happened on April 19 can war between the colonies and Great Britain be avoided?
If 8 men can chop down 28 trees in one day, how many trees can 20 men chop down in one day?
How do scientists use seismic waves to determine the interior structure of Earth?
Determine whether the sequence coverage or diverges. If it converges, give the limit. 48, 8, 4/3, 2/9, ...