Ibbythe8356 Ibbythe8356
  • 04-05-2019
  • Social Studies
contestada

When planning your week the first thing to consider about each activity that your scheduling is its priority level?

Respuesta :

RyleeCanaan12 RyleeCanaan12
  • 04-05-2019

Answer:

yes

Explanation:

i think that if you are going to get things done, than you need to think about how important they are. if something is needed in two weeks, you can save that for later. if something is needed in two or three days, i would do that first. different people have different ways of planning, but that is my opinion

Answer Link

Otras preguntas

26. Which of the following is an equation for the line that is perpendicular to the line y = 2x - 9 and passes through the point (-4,5)? A. y = 2x+7 B. y = -1/
m r co m p re ssmy prev acc got banned and this is my new acc...im a boy of 19
d Bula drives to work and back every day. One way, the trip is fifty miles. How many miles does she drive in five days?
Which decimal below is equivalent to 5/9?
What is a tree? I’m graduated so my points are up for grabs cause I’ll never use them. I have to at least as a question with it though.
Find the Slope Using the slope equation
what are your priorities? projects?​
In the figure, angle A measures 38 degrees and angle D measures 26 degrees. What is the measurement of angle E?
How would ancient astronomers from Silla have observed the movement of stars and other objects compared to astronomers today?
Which of these statements is true: 1) It is not uncommon for most of the people in the top 5 percent of income-earners to be 45 years old and up. 2) Three-quar