liluv4590 liluv4590
  • 02-04-2019
  • Mathematics
contestada

A potter works 4 days a week, makes 14 pots per day on average, and charges $24 a pot. Money per 4-day workweek?

Respuesta :

greubel80
greubel80 greubel80
  • 02-04-2019
Step by Step:

14 average pots x 4 days a week = average money made

14x4= 56

56 pots a 4-day week x 24$ a pot

56x24 = 1344$
Answer Link

Otras preguntas

Plot the point on this function with an x-value of 6. What is the y-value of this point?
1. Arc QR = Arc RS = 2. Find x and y -- if your answer is not a whole number, round to the tenths!
What is 4.5 repeating as a fraction?
The cells ____ and shrivel up
Solve the system of equations below by graphing. Type in the ordered pair (x,y) for your answer y=-2 x+y=5
( i only need number one and number 7 ) someone please i’m desperate i have so much work i need done by monday even if you only do one of them it is greatly app
PLSS HELP MEEE!! It'll be very appreciated
A 16.0 kg canoe moving to the left at 10 m/s makes a head-on collision with a 19.0 kg raft moving to the right at 7.0 m/s. After the collision, the canoe moves
A circle with a radius of 5 is transformed into the following function: (x/3)² + (5y)² = 25 What percentage of the original circle's area is the area of the new
Solve the system of equations below by graphing. Type in the ordered pair (x,y) for your answer y=-2 x+y=5