15 workers working 8hrs a day can complete a piece of work in 20 days. In how many days will 10 workers do it,working 6 hrs a day? please help!!

Respuesta :

ridmitharuka
ridmitharuka ridmitharuka
  • 02-08-2021

Answer:

40 days

Step-by-step explanation:

w1*h1*d1=w2*h2*d

15*8*20=10*6*d

2400=60d

d=2400/60

d=40

Answer Link

Otras preguntas

Question 3(Multiple Choice Worth 4 points) (02.07)Two similar triangles are shown below: Two triangles are shown. The sides of the triangle on the left are
One of the primary purposes of a Maya city was to serve as a gathering place for __________. A. large trade markets B. the royal family C. the central governmen
Please answer! I will make brainliest, give thanks, and a follow!
Match the following items. 1. graphite precious metal 2. ruby gem 3. gold common mineral
the head of the aztec goverment was called a)emporer b)a king c)a president
Based on the chemical equation, use the drop-down menu to choose the coefficients that will balance the chemical equation: ()Zn + ()HCl → ()ZnCl2 + ()H2
what type of pronoun introduces the adjective clause. Demonstrative, Relative or Personal?
what to do if your instructors teaching style is very different from your learner preference
Learning a second language can increase one’s options for a future ______________.
The bob (weight) at the end of a pendulum has a mass of 0.3 kilograms. The bob is pulled to position B and allowed to swing. It goes all the way to position C a