shresthasamrachana06
shresthasamrachana06 shresthasamrachana06
  • 01-04-2021
  • Mathematics
contestada

12 workers can do a peice of work in 20 days. How many workers should be added to complete work in 16 days?​

Respuesta :

atchleyamirah69
atchleyamirah69 atchleyamirah69
  • 01-04-2021
3 workers

if 12 workers can do a piece of work in 20 days, then one person can do it in 240 days. 240/16 is 15. That is the number of workers that you need in total to it in 16 days. Since the question ask how many more workers,
15 - 12 = 3 more workers.
Answer Link

Otras preguntas

Feeling slightly uncomfortable during exercise A. can indicate that there's a problem with your heart. B. is a signal that something is wrong. C. mea
A person who does not believe he or she can ever succeed is displaying _____. pessimism resilience optimism perfectionism
I need help on 3 and 5 pls.DO NOT SAY THE ANSWER!!!
Which of the following gives the absolute age of a fossil? a. relative dating b. radiometric dating c. cladogram records d. index fossils
1. (1 pt) Which kind of artwork did Currier and Ives make that was very popular with Americans? A. paintings B. photographs C. prints D. drawings 2. (1 pt)
How do I find the length of P?
How is DNA related to chromosomes????????????:/
help please with math
Some one explain this to me please "10 points"
If you apply a stain for cellulose to a section of celery stem, where would you expect to see color in the cells?