goeln1260 goeln1260
  • 01-07-2020
  • Physics
contestada

give relation between potential work and time​

Respuesta :

mfonudo
mfonudo mfonudo
  • 04-07-2020

Relation between work done and potential is a change in the potential energy associated with the force. The negative sign provides the convention that work done against a force field increases potential energy, while work done by the force field decreases potential energy.

Answer Link

Otras preguntas

What is the axis of symmetry
PLEASE HELP AND SHOW WORK!! A water basin starts with 2 liters of water and fills up at rate of 0.4 liters per second. Write and solve an equation for the numbe
What is 4.33 as a fraction
please help 1) _____ 2) _____ 3) _____ 4) ____ 5) ____
List three features of S. crassirotris' skeleton that imply that the animal was adapted to flying.
i feel like days after watching the super bowl i still cannot get over the fact that the entire season was ended with the most bum super bowl ever
what is the Bohr model of hydrogen​
Work out the size of angle x.
Why are watersheds important for the maintenance of water quality? Choose all that apply. Select 2 correct answer(s) Question 3 options: their soil and plants c
Zero Conditional tense uses