jreedy4403 jreedy4403
  • 02-08-2019
  • Computers and Technology
contestada

In planning for disaster recovery, what is the ultimate goal?

Respuesta :

bbb99
bbb99 bbb99
  • 04-08-2019
Be able to get the systems fully operational with minimum downtime. That means having parallel backups of data but also systems that can be bored up often at a different location
Answer Link

Otras preguntas

Part A: What are the lengths of the parallel sides of Terrance's workshop? Part B: How many hooks does Terrance need for his plan? Part C: What is the minimum n
In the figure below, KLMN is a rhombus. If KN=2x-1 and KL=8x-7, find the value of x.
where are the ffa jackets lettered and embroidered? (city and state)
The temperature was 40° at 2 pm. By 8 pm, the temperature had dropped to 2°. Find the percent of decrease in temperature.
Ethan has $4.50 to spend on 2 bags of chips that cost 0.75 each and gum that costs .25 per pack. What is the maximum packs of gum that he can buy?
what is the one goal of medicare
(50 POINTS) Which of the following represents the graph of f(x) = 2(x + 3)? a. Graph begins in the second quadrant near the line y equals negative 3 and increa
help me! its overdue!
A user is concerned about losing critical data on single computer in the event of an unforeseen system crash. The user is advised to implement fault tolerance.
Kindly solve this question in simplest solution, I'll be thankful ​